Projects
Wind Park in Larissa area
This wind farm is located in Kokkinochoma of Tempo, in the prefecture of Larissa. It has a total power of 1.6 MW and was built by a subsidiary company of the DELTA TECHNIKI group.
Two 800 KW wind turbines have been installed here. The opening of the park took place in 2016.