Delta Techniki has recently been awarded contracts for constructing four (4) more photovoltaic power plants in the Peloponnese and Thessaly region, with a total capacity of 13MW. The company was selected by the owner-investors thanks to the well-known in the market quality of its work, the excellent cooperation and the confidence it provides them that the projects will be completed in the best possible way and on schedule. The first project has already been put into operation, while the rest are expected to be completed gradually by the summer of 2025. The contracts include the execution of the projects on a “turn-key basis”, as a main contractor, with equipment of fixed mounting structure or single-axis trackers.